STRUCTURAL WELDING / NEW ENGLAND
AWS D1.1 · D1.6 · CWI-BACKED
42.9531° N / 72.4570° W
WESTMORELAND, NH
— CJP MOMENT CONNECTIONS ARE THE BREAD AND BUTTER

Structural
steel
welding.

FeC Ironworks runs AWS D1.1 structural steel welding across NH, VT & MA. Fillet, PJP, and full-penetration CJP moment connections, any geometry, all positions, field or shop. Welds laid clean and fast so they pass UT the first time, with rework included until passing CWI inspection.

Cert / 01
D1.1.
FCAW & SMAW · All-position · Unlimited
Cert / 02
D1.6.
SMAW Stainless · All-position · ≤ 3/8"
Joints
CJP / PJP
Any geometry · moment connections
QC
CWI
Rework until passing inspection

Every joint,
every position.

Structural welding to AWS D1.1, carbon and stainless, in shop or in the field. All joint geometries, all positions.

01 ─ FIL
Fillet Welds
All-position fillet welding to AWS D1.1, production-rate work, per piece or per hour.
D1.1 / FCAW / SMAWAll positions
02 ─ PJP
Partial Joint Penetration
PJPs of any configuration, single bevel, double bevel, J-groove, U-groove.
D1.1 / Any geometryPer piece or hourly
03 ─ CJP
Complete Joint Penetration
Full-pen moment connections, any joint geometry. Client supplies steel backing unless arranged in writing; reusable copper backing available.
D1.1 / Moment conn.CWI-inspected
04 ─ SST
Stainless SMAW
All-position stainless stick welding to AWS D1.6 within limited thickness, well suited to precast erection welding.
D1.6 / SMAW SS≤ 3/8"
05 ─ FLD
Field Installation
On-site structural welding, column splices, base plates, embeds, misc steel, and post-erection detailing.
Engine-driven welderAll gear
ALL WORK INCLUDES REWORK UNTIL PASSING CWI INSPECTION
FIELD OR SHOP · HOURLY OR PER-PIECE

Structural work across
the tri-state.

Structural steel welding within a 60-mile radius of Westmoreland, NH: Keene, Walpole, Peterborough, Brattleboro, and Greenfield, plus the surrounding NH, VT, and MA towns. Per diem applies beyond 60 miles at GSA standard rate. Multi-day mobilizations welcome.

Primary
60 mi
Extended
+ Per Diem
States
NH · VT · MA

Structural welding
questions.

Certs, moment connections, and field versus shop.

Q ─ 01
Certifications
AWS D1.1 structural (unlimited thickness, all-position, FCAW and SMAW) and AWS D1.6 stainless. Welds laid clean to pass UT the first time, with rework until passing CWI inspection.
AWS D1.1 · D1.6CWI-backed
Q ─ 02
Moment Connections
Full-penetration CJP moment connections are the core of the work, any joint geometry. Client supplies steel backing unless arranged in writing; reusable copper backing available.
CJP / PJPAny geometry
Q ─ 03
Field Or Shop
Both. On-site with an engine-driven rig, or shop overflow on your floor. Hourly or fixed per piece for production runs.
Field · ShopHourly / per-piece

Got a CJP that
needs running?

Send the print and the weld detail, or call. Same-day rate cards and bid letters.